Building Department/Code Enforcement

 

 

 



Steve Mantor, Code Enforcement  Officer
This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Albert Gasparini, Backup

756-6671

Helpful links and PDF Files available for download

 

Adobe  Reader

To read .pdf files
(free download)
 

REVISED TOWN FEE SCHEDULE

Resolution 175-2016

October 24, 2016

 

BUILDING FEES

 

One and Two Family Homes.........................$25 Per 100 sq. ft. floor area

(New Homes and Additions)   

Non-residential or Combined Use..................$35 Per 100 sq. ft. floor area

Utilities (permitted towers, substations, etc.)..$1,500 up to 3,000 sq. ft.

                                                                 $35 per 100 sq. ft. over 3,000                                                                  sq. ft.

Renovations (where building permit is           

 required)..................................................$150

Garages....................................................$20 per 100 sq. ft. floor area

Decks and Porches.....................................$75

Chimneys, Wood Stoves and Gas Heaters....$40

Mobile Homes - Single................................$150

Mobile Homes - Double Wide.......................$225

Demolition Permits.....................................$75

Swimming Pools - Above Ground.................$60

Swimming Pools - In Ground.......................$100

Sheds 144 sq. ft. and up to 300 sq. ft...........$25

Sheds over 300 sq. ft.................................$20 per 100 sq. ft. floor

Solar Residential........................................$50

Solar Commercial......................................$0.36 per sq. ft. of panel

 

SEWAGE DISPOSAL FEES

 

Septic Systems - New................................No Fee

(Profesional Engineering Perc Test and

Design Required by New York State

Department of Health)

 

Septic System Replacement or Repair..........$40

 

Sewer Hookup to Town Sewer District:

Hookup and Inspection...............................$75

Sewer Repair Inspection.............................$40

Fitting (if needed).......................................$30

 

EXCAVATION FEES

 

Culverts Under Driveways..........................$35

Highway Dept. Inspection)

Culverts Across Roads..............................$100

(Highway Dept. Inspection)

 

ZONING AND PLANNING FEES

 

Planned Development District Application Fee

 (Inc. 10 Acres).........................................$500

 Over 10 Acres and Under 25 Acres.............Add $125/Acre

 Over 25 and Under 50 Acres......................Add $100/Acre

 Over 50 Acres..........................................Add $75/Acre

(Conservation Lands Will Be Excluded

From The Acreage Calculations)

Amendment to the Planned Development                     

 District....................................................One-Half of the Original Fee

 

Special Use Permit or Variance -               

  Non Commercial.....................................$40

Special Use Permit or Variance -                

  Commercial Use.....................................$200

Renewable Special Use Permit or               

 Variance - Commercial Use*.....................$100

Site Plan Review

 Up to 10 Acres.........................................$300

 10 Acres and Less Than 25.......................$1,000

 25 Acres and Less Than 50.......................$2,000

 50 Acres.................................................$4,000

(Undeveloped Lands Will Be Excluded

From the Acreage Calculations)

 Renewal Fees..........................................One-Half of the Original Fee

 

Subdivision Application - Minor Subdivision..$30 per lot            

Subdivision Application - Major Subdivision..$100 plus $30 per lot for

                                                                initial application; $50 plus $10

                                                                per lot for Final Plat approval

                                                   

Lot Line Adjustment...................................$50

 

MISCELLANEOUS FEES

 

Building Permit Renewal............................One-Half original permit cost

Temporary Certificate of Occupancy...........$10

Certificate of Occupancy Search/    

 Prior to Zoning........................................$15

Certified Copies/Genealogy Searches........$10

Park Usage (day usage)...........................$25 plus a refundable $25

                                                              deposit that is returned to

                                                              applicant if park is left in good

                                                              condition following inspection

Festivals or Public Gatherings....................$5

Beer Permits...........................................$20

Dog Licenses

 Spayed or neutered.................................$7

 Unspayes or unneutered..........................$15

 Late fee if not renewed within 30 days

  of expiration..........................................$5                

 Tag Replacement fee...............................$2

Signs subject to Sign Ordinance................$25

 Fee will be waived if sign permit

 is part of a site plan approval

Billboards................................................$50

Photocopies, letter or legal........................$0.25

Copies of electronic media CD...................$3.00

Copies of Engineering Prints......................$5.00

 

*Any other annual town fees associated with the commercial use of the property will be waived upon payment of the fee for Renewable Use Permit or Variance.